Project

To refurbish an existing hotel into a new Holiday Inn Express utilising the brand new Generation 4 interior design brand. The creation of an additional 20+ bedrooms within the existing site demise increasing the hotel to 150+ bedrooms.

  • Client: Atlas Hotels
  • Location: Portsmouth
  • Year: 2015/16
  • Total Value: £5m
  • Services Value: £1.8m
  • Duties: Performance Specification and Post Contract Inspection

Design Team

  • Project Manager: Edmond Shipway
  • Architect: Franklin Ellis Architects
  • Quantity Surveyor: Edmond Shipway
  • Structural Engineer: Ridge and Partners
  • Main Contractor: Bowmer & Kirkland
  • Electrical Contractor: John Dawson Electrical
  • Mechanical Contractor: Sharpe Mechanical

Our Projects

and Sectors

ZF Group, Blythe Valley Business Park

Industrial

Aperture at Pynes Hill, Exeter

Office and Commercial

2 Snowhill

Office and Commercial

Living Well Centre, Severn Hospice

Healthcare

Wolverhampton Girls’ High School

Education

Halesowen College Block 4

Education

Citizen Machinery UK Turning Centre of Excellence

Industrial

Boilerhouse Soapworks

Office and Commercial

GfA Tournament Fields

Industrial

Jessop House, Reception Refurbishment

Office and Commercial

Holiday Inn Express Bath

Hotel and Leisure

Holiday Inn Express Bicester Gateway

Hotel and Leisure

Fort Dunlop

Office and Commercial

Ricoh Products Client Reception Area

Office and Commercial

EEF Technology Hub

Education

Volvo, Stourbridge

Office and Commercial

Bull Street

Office and Commercial

Post and Mail Car Park

Office and Commercial

Bunker Building

Office and Commercial

Moog

Industrial

Holiday Inn Express Portsmouth

Hotel and Leisure

New Surgery, Malinslee

Healthcare

New Surgery, Fisher Road

Healthcare

New Retail Development, Sheldon

Retail

John Osborne Arvon Centre

Residential

John Lyon School

Education

Alamo

Industrial

Alcoa

Office and Commercial

Dartmouth Park

Hotel and Leisure