| Client: |
Tristock Ltd |
| Location: |
Birmingham City Centre |
| Year: |
2008 |
| Total Value: |
£4.7m |
| Services Value: |
£1.4m |
| Duties: |
Abridged duties for all Mechanical, Electrical and Fire precaution installations. |
Design Team
| Project Manager: |
BBLB Architects |
| Architect: |
BBLB Architects |
| Quantity Surveyor: |
EC Harris |
| Structural Engineer: |
Stewart & Harris |
| Main Contractor: |
Piper Construction |
| Electrical Contractor: |
Spectrum Electrical & Mechanical |
| Mechanical Contractor: |
Spectrum Electrical & Mechanical |
Description of Project
Three existing dilapidated Victorian school buildings dating back to 1809 have been sensitively restored to provide 22 unique city centre living apartments. A new high quality contemporary building has been constructed to blend with the original buildings to provide a future 15 apartments.
Project Download
Download Project as PDF Document